Precast pre-tensioned concrete · Pecém, Ceará

Your house's walls, standing in 3 days.

Structural masonry needs 45 to 60. The difference isn't just time — it's every cost no one puts on the spreadsheet.

NBR-compliantMCMV/Caixa-readySINAPI-based

Cost blindness

0 mil

lawsuits in the MCMV program

R$ 0 mi

in damages awarded since 2014

+0%

labor-rate increase projected under PEC 148

0%

of a traditional wall's cost is labor alone

Brazilian construction prices walls by the square metre of material — and ignores the rest.

Where does every real go?

The problem isn't the material. It's the labor.

Per m² of wall. Masonry spends nearly half its cost on labor. With AFDC, that collapses to about 7%.

Traditional masonryR$ 209,56/m²
45%
Labor R$ 93,70 Material + other R$ 115,86
AFDC systemR$ 253,90/m²
7%
Labor R$ 15,82 Material + other R$ 238,08

−83% de mão de obra por m². De 45% do custo para cerca de 7%.

The traditional quote tends to forget — and AFDC eliminates or cuts:

Reinforcement (+R$ 15–35/m²)Rework and pathologiesFreight and logisticsAuxiliary equipmentWeather downtimeSchedule: 45–60 days on site

SINAPI composition — Structural masonry, CE, 01/2026 (Não Desonerado).

The value proposition

An advantage on four fronts.

The right question isn't only “what's the price?” but which option needs less capital, less risk and a lower total cost.

01

Financial

−11%

in total cost of ownership

What decides it is total cost — not the face price. 83% less labor, no rework, and none of the costs a traditional quote forgets: freight, equipment, weather downtime.

02

Time

3dias

to raise the walls — vs 45 to 60

The structure standing in days, not months — and less own-capital tied up. Up to 3× more houses with the same crew and schedule.

03

Climate

Rain won't stall it

Factory-made panels and fast assembly: weather downtime stops weighing on the schedule. An industrial process with less waste and a cleaner site.

04

Tax

Net vs net

The fair comparison is net against net, not gross against gross. The right framing is confirmed with your accountant.

Why now

The industry is about to change. You're already protected.

Two regulatory shifts only widen the gap between masonry and AFDC.

+R$ 30/m²+R$ 5/m²
Alvenaria AFDC

PEC 148 · passed the Senate CCJ on 2025-12-10

Work week 44h → 36h

The labor rate rises +32%. Impact on masonry: +R$ 30/m². On AFDC: +R$ 5/m².

PL 4749 · passed the CCJC on 2026-03-06

Structural warranty 5 → 10 years

R$ 15 bn of potential MCMV liability. The 6 most-litigated pathologies are eliminated by design — not by inspection.

The cost of a traditional wall will only rise. AFDC's won't.

How it works

Three people. Three days. The house closed.

171 m² of wall ready for finishing — no specialist bricklayer.

  1. Day 01

    Foundation ready

    The slab and starter bars receive the system. No scratch coat, no render, no grouting.

  2. Day 02

    Panels raised

    Pre-tensioned 90 mm panels, tongue-and-groove fit, set in place by crane.

  3. Day 03

    House closed

    Waterproofing additive at R$ 2/m — a unique advantage, at no extra cost. Ready to finish.

Credibility

NBR 8953-compliant (Group I), governed by 9 NBR standards

Exempt from DATec (PBQP-H/SINAT) — permanent validity

MCMV/Caixa-ready — all income bands (1–4)

SINAPI-based (Decree 7.983/2013)

Sustainability

Less cement. Less waste.

Precast uses less cement than in-situ concrete, and a controlled industrial process cuts on-site waste. It's the substance behind the green in our brand.

Explore the approach

Talk to the factory

How much is your project losing without seeing it?

Request a quote or schedule a visit to the factory in Pecém, 60 km from Fortaleza.

The factory · Pecém — São Gonçalo do Amarante, CE